Timber frames, roof trusses and structural steel from one team — plan-reviewed before every quote, and managed end to end.
Timber frames, roof trusses and structural steel from one team — plan-reviewed before every quote, and managed end to end so your project team isn't chasing six separate suppliers.
Send Us Your Plans
Fill out the form below and our team will review your plans and reply within one business day.
PROBLEM
Most structural supply failures don’t start on site. They start when a supplier takes your plans, pushes buttons, and ships product without reviewing what you actually need.
Wrong timber specs land on site. Steel arrives out of sequence. The engineer detailer is chasing a correction while your installer stands around costing you money. And when the reinspection gets triggered — you own it.
One review. One team. One point of contact — from base stage to lock-up.
What we do
Engineered to your plans. Manufactured under one roof and quality-checked before dispatch. Not a default product — the right product for your job.
Designed and supplied in coordination with your timber package. No split supplier relationships. No specs that do not talk to each other.
Supply, scheduling, delivery and installation coordinated by one team. You hand off the structural stage. We own the outcome.
Reviews
Reinspection was triggered on our last frame stage with another supplier and it cost us two weeks. With Glencoe it just wasn't an issue - they own that outcome
They picked up a spec issue on our plans before we'd even paid for the quote. That's before site, before cost. Saved us a headache we didn't know was coming.
Running four projects at once, I don't have time to chase suppliers. One contact at Glencoe handles timber, steel and the whole frame stage across all of them.
Why us
Most suppliers take your plans and send a price. We read the plans first. We identify the structural issues before they become your problem on site — before a dollar is spent or a nail is in the ground.
Coordinating a timber supplier and a steel supplier separately means two delivery windows, two sets of specs, and twice the opportunity for something to land wrong. Glencoe supplies both. One conversation, one package, one point of accountability.
If Glencoe installs and a reinspection is required, we pay for it. No other structural supplier in Victoria backs their installation like that. It is not a policy statement — it is how confident we are in what we deliver.
Every installer on a Glencoe managed frame stage is a qualified carpenter, assessed and certified by Glencoe, with endorsement through Carpentry Australia. No cowboys. No shortcuts.
The saving does not come from cheaper product. It comes from eliminating the costs that bad coordination creates — wrong specs, reinspections, delays, and the project manager hours spent chasing suppliers across a single stage.
From initial plan review through to a completed frame stage — one contact at Glencoe manages the entire process. You do not coordinate between timber, steel, installation and delivery. We do.
Most suppliers take your plans and send a price. We read the plans first. We identify the structural issues before they become your problem on site — before a dollar is spent or a nail is in the ground.
Coordinating a timber supplier and a steel supplier separately means two delivery windows, two sets of specs, and twice the opportunity for something to land wrong. Glencoe supplies both. One conversation, one package, one point of accountability.
If Glencoe installs and a reinspection is required, we pay for it. No other structural supplier in Victoria backs their installation like that. It is not a policy statement — it is how confident we are in what we deliver.
Every installer on a Glencoe managed frame stage is a qualified carpenter, assessed and certified by Glencoe, with endorsement through Carpentry Australia. No cowboys. No shortcuts.
The saving does not come from cheaper product. It comes from eliminating the costs that bad coordination creates — wrong specs, reinspections, delays, and the project manager hours spent chasing suppliers across a single stage.
From initial plan review through to a completed frame stage — one contact at Glencoe manages the entire process. You do not coordinate between timber, steel, installation and delivery. We do.
Process
Upload your plans through the form above. We review every job before quoting — no automated pricing, no guesswork.
We read the plans, identify structural considerations, and ask the questions most suppliers skip. You get a quote that reflects what the job actually needs.
Timber and steel are confirmed as one coordinated package. Delivery windows and installation scheduling are locked in before a slab is poured.
On a managed frame stage, Glencoe coordinates delivery, installation, and any required engineering sign-off. Your team gets a completed structural stage. Not a coordination job.
Quality-checked on site before handover. And if a reinspection is required — we cover it.
FAQs
We prefer to supply both as a coordinated package — it eliminates the risk of specs not talking to each other. But we can discuss your specific situation. Send us your plans and we will tell you what makes sense for your project.
Structural design, timber supply, steel supply, delivery scheduling, installation, and coordination through to a completed structural stage. One team. One outcome. Your project manager does not chase anyone.
If Glencoe manages the installation and a reinspection is triggered, we pay the cost. No exceptions, no caveats. It applies to all managed frame stage projects.
The earlier the better. Reviewing plans at design stage allows us to identify structural issues before they become costly changes during construction. Send us your plans as soon as they are available.
Both. We work with volume builders across multiple concurrent projects and with project builders on individual custom and multi-res builds. Our managed frame stage scales to your project pipeline.
Victoria-wide. Send us your plans and we will confirm coverage for your specific project location.
Most structural problems are not discovered on site. They are created before the quote is accepted. Send us your plans today and our team will review them, identify the risks, and show you exactly how Glencoe manages the structural stage from base to lock-up.
Copyright @ 2026 Glencoe Group | All Rights Reserved.
Landing Page & Digital Marketing by Uprise Digital